This site is only being updated in part now. Existing full posts will still remain, but for new blogs and more information on me, please see my new website HERE

Showing posts with label Electrified Lines. Show all posts
Showing posts with label Electrified Lines. Show all posts

Sunday, 12 June 2011

When Two Transports Go To War - The Electric Fight-Back in the 1900s

In my last blog post (here) I talked about how the trams, which were spreading through the suburbs of Britain’s cities, began to challenge the railway’s dominance of suburban passenger traffic. The trams offered a more convenient, clean and cheaply priced door-to-door service than the railways’ somewhat inconvenient, overcrowded and dirty ones. In this blog post I will look at how Britain’s railway’s fought back against this threat.

This week, it will not have escaped anyone’s notice that South West Trains was having a very bad time due to failures in their electrified services. Signalling failures, cable theft and bad customer care created a perfect storm where the company looked very bad, even though the problems were not their fault. The electrified network that SWT currently operate was established by their predecessors, the London and South Western and Southern Railway (L&SWR) in direct response to the tram threat. However, if the L&SWR had pursued a different strategic course, and had adopted more widespread use of the steam railcar, then the problems encountered this week may never have materialised.

Steam railcars were effectively carriages powered by a small steam engine in their front (shown). In the L&SWR’s case the General Manager, Charles Owens, felt that the railcars could be used where the level of traffic did not require the use of a locomotive and carriage. Indeed, the L&SWR were using them on 18 routes by 1912 (although 3 had been discontinued by that point).[1] However, while not strictly a response to the tram threat, as many were used on small branch lines, some did migrate towards the suburban districts, and one service was run between Twickenham and Gunnersbury.

Yet, the L&SWR wasn’t the only company to build steam railcars. Indeed, after borrowing one of the L&SWR’s railcars for trials, and being suitably impressed, the Great Western Railway eventually ordered 99 to operate services on local lines.[2] Furthermore, other companies also built them and 173 are known to have been constructed before 1923.[3] Yet, the steam railcars could never effectively defend against the tram threat as they could only could carry limited numbers of passengers. Indeed, while some did have extra carriages attached to increase their capacities, one was always the maximum. Thus, while they looked like a more ‘modern’ way to travel, in reality they were a re-hash of old ideas.

Thus, some railway companies started to turn to electric traction to match the speed, comfort and cleanliness of the trams, and to make rail travel attractive again. Because of the large electrified network that existed on the southern suburban lines in the 1920s and 1930s, many authors have ignored the fact that initially electrification was a national movement. By 1890 there were a number of electric trains operating on piers, however, in the 1890s a number of standard-gauge suburban lines were opened including the City & South London Railway (1890), the Waterloo & City Railway (1898), the Central London Railways (1900) and the Liverpool Overhead Railway (1893). However, these were all new railways, built when the main line railway companies were still benefiting from rising passenger traffic figures and were not responses to any particular threat

Yet, with people deserting the trains to travel by tram, the railways started investigating electric traction. The Mersey Railway was electrified in 1903, the Lancashire and Yorkshire electrified its Liverpool to Southport route in 1904 and the North Tyneside Systems of the North Eastern Railway were also upgraded in 1904. Furthermore, in 1903 the Metropolitan District Railway started to electrify its lines, followed by the Metropolitan Railway in 1905. But these electrifications, that used a range of different electric systems, were unsuited for the long-distance services that many of the main line companies operated because of their low voltages.[4]

Now, at this point most authors would direct your attention to the fact that the different mainline companies adopted different electrical systems, and indeed they did. The London, Brighton and South Coast Railway started electrifying its suburban network in 1909 using 6,700v ac current supplied from overhead cables. The North Eastern Railway started using 1500v dc current overhead systems on Teesside in 1913. The London and North Western Railway used the London underground’s 4-rail 630v dc system between Watford and Euston, and between Broad Street and Richmond from 1909. The Midland Railway tested 6600v dc systems between Lancashire and Heysham in 1908. Lastly, the L&SWR started to electrify its suburban network in 1912 using third rail 660v ac systems. Thus, by 1923 363 miles of standard gauge line in Britain was electrified using many different systems.[5]

But in a way the minutiae is not important. The important question is why the multiple systems were adopted. By the 1900 most technical aspects of the British railway industry had been standardised through the railway Clearing House (RCH). So, train couplings were the same, accident prevention devices had been formalised, signalling was (mostly) uniform and the height of buffers were all identical. Yet, the railways did not come together to agree a uniform system of electrification. Indeed, this was despite companies having territories, for example those of the southern companies, where their issues regarding declining passenger numbers were almost identical. Indeed, years later the Southern railway, which took over the southern companies, converted all the London, Brighton and South Coast’s overhead electrified systems to the London and South Western’s third rail one.

The reason for this was that the companies, while unified in many respects through the RCH, acted independently in the face of the tram challenge. Because the vast majority of Britain’s railway managers and directors had been working with steam traction throughout their careers, a consensus on what was the best electric system to adopt did not develop within the industry. Therefore, because of their limited experiences and knowledge of electric traction, the result was the haphazard implementation of a hotch-potch of electric systems.

However, the most important question is whether the growth in suburban electric services worked in countering the tram threat before 1923? Nationally the impact cannot be discerned as the majority of passenger trains remained steam hauled. Furthermore, the First World War distorted the figures for the number of passengers conveyed as the railways had unnaturally high usage. Yet, specific figures have been detailed by Colin Chivers for the number of passengers using the L&SWR’ suburban network. Before electrification in 1915 the number of suburban passengers had fallen to 23.3 million. However, by 1920 this had risen to 52.6 million. As Chivers argues ‘an increase of 126% in those five years has to be judged a successful outcome.’[6]

Whether this was repeated elsewhere is unknown, and nationally the number of passengers the railways carried did fall off in the post war period.[7] However, there is clear evidence here that the electrification of commuter lines did improve passenger numbers in those districts. Indeed, after grouping in 1923 the newly formed Southern Railway, who progressively electrified more routes, had consistent passenger traffic growth until 1937. While the northern railway companies continued to be challenged by trams, buses and cars between 1923 and 1937, the number of passengers conveyed by the Southern Railways rose from 236 million to 379 million, a growth of 60.59%.[8] Subsequently, where electrification was applied, the railways remained the dominant form of passenger conveyance until after Work War Two.

------------------

[1] The National Archives [TNA], RAIL 411/415, Personal collection of details of a varying nature covering costs, and information of a general character, p.89

[2] http://en.wikipedia.org/wiki/GWR_steam_rail_motors

[3] http://en.wikipedia.org/wiki/Railmotor

[4] Boyes, Grahame, ‘Electrification,’ The Oxford Companion to British Railway History, (Oxford, 1997) p.143

[5] Boyes, ‘Electrification,’ p.143

[6] Chivers, 4 The Riverside Electric, p.164

[7] Munby, D.L. and Watson, A.H.(eds.), Inland Transport Statistics, Great Britain, 1900-1970, (Oxford, 1978) p.100

[8] Moody, G.T., Southern Electric: A history of the world’s greatest suburban electric system, (Shepperton, 1957) p.83-84

Friday, 30 July 2010

When decision making changed for Britain's railways - The L&SWR's Decisions in the early 20th Century

In the late 1800s the railways were still dominant in the transportation market. If you wished to move yourself, your luggage or your goods, the railways were only way to do it quickly and efficiently. However, the railways’ profitability and performance was declining in this period. This was possibly for a number of reasons such as declining management quality, ingrained working patters, managerial empire building and intrusive and costly and governmen legislation. While I wouldn’t like to go into these factors in detail, it was clear that the railways weren’t doing as well financially as in their formative years. In short, something needed to be done to get the profitability back up, and the London and South Western Railway (L&SWR), who had suffered like most railways, set to work in the early 20th Century. In this blog entry I will describe briefly the reasons for two major decisions that the L&SWR took to attempt to secure the profitability of their passenger service between 1898 and 1922. These are the rebuilding of Waterloo station and the suburban Electrification project. I will show that the initiating factor for investment changed on the L&SWR, as it did within many companies in the early twentieth century, because of a change in the business environment.

But why should I just focus on the company’s passenger traffic? Despite having a booming goods business, the majority of the company’s revenue came from passenger services. Thus, if we take 1900 as an example, while the goods revenue of the company came to £1,356,209, the passenger revenue was £2,997,274 (or 68.8% of overall revenue). Thus any decisions regarding the company’s passenger services were vital to its profitability.

Waterloo Station

Has anyone ever read Jerome K. Jerome’s 1889 book Three Men in a Boat? In it he described the problem with Waterloo Station in the late 19th Century.

“We got to Waterloo at eleven, and asked where the eleven-five started from. Of course nobody knew; nobody at Waterloo ever does know where a train is going to start from, or where a train when it does start is going to, or anything about it. The porter who took our things thought it would go from number two platform, while another porter, with whom he discussed the question, had heard a rumour that it would go from number one. The station-master, on the other hand, was convinced it would start from the local.”

While I won’t go into great detail as to why the station was so difficult to navigate, in short, it had been built up bit by bit over the years since 1848. The L&SWR hadn’t conducted complete rebuilds of the station as more capacity was required to accommodate the traffic, but rather had just ‘bolted on’ new platforms, canopies and facilities every now and again. Thus, in 1898 Waterloo actually had three stations that were all connected; Central, which was the old 1848 structure, South, added in 1878 and North, dating from 1885. This was confused by the fact that the 18 lines running into the station only shared ten platform numbers.

In the 1890s the company was facing a capacity problem at Waterloo as passenger traffic had grown at a very rapid rate. The table below shows the growth in the number of passengers carried, the number of passenger train miles run and the revenue from passenger traffic between 1890 and 1900. Therefore, the rebuild it was a direct response to the fact that passenger traffic had grown at a very rapid rate in the 10 years and that more accommodation was required. Thus, the move to rebuild the station taken in 1898 was reactive to the physical constraints of the company’s infrastructure.

In a sense, this was the last of the L&SWR’s great projects that was reacting to the physical constraints of the company’s infrastructure. To look at any business decisions before 1900, the majority were made because the continually rising traffic meant that the company required extra facilities to deal with that fact. Thus, the company were never exceedingly worried that the expense would be unnecessary as in the long run the expected revenues from passenger growth would eventually cover the cost of construction. This was essentially because the railways were operating in a period when they had monopolies on transportation in most places and did not see any challenge to their unique position. Thus, the Waterloo rebuild was continuing this pattern of decision making, but, it was the last large-scale investment that adhered to it.

The station was completed in 1919 and on the 21st of March 1922 was officially opened by Queen Mary.

The Electrification Scheme

There were a number of things that affected the way that the L&SWR viewed their suburban passenger services in the early 20th century, most of which involved electricity. Firstly, the company opened its long-awaited extension to Bank Station via the Waterloo and City line. Electrically run, this was a good testing bed for electric trains within the L&SWR’s sphere of influence. Yet, at this point the L&SWR showed little interest in using the technology on its overground services. Further, up to 1905 the company cooperated with the Metropolitan District Railway Company when they electrified their lines to Richmond and Wimbledon. The Chairman of the L&SWR, Campbell, said he would watch how the new services did with interest. Indeed, the result was that passengers deserted the slow L&SWR steam hauled routes to the city in favour of the clean electric trains. The most important event came when the London United Tramways Company (LUT) started extending into the L&SWR’s suburban region. They reached Hounslow in 1901, Twickenham in 1902 and Hampton court in 1903. Further, in 1902 the LUT received permission to extend to Sunbury and Wimbledon and was looking at building lines to Staines. Finally, in 1906-07 the LUT extended to Kingston, Surbiton, New Malden and Wimbledon.

Thus, the L&SWR started to suffer in its suburban zone. According to Faulkner and Williams in 1902 the L&SWR lost 64% of its receipts on the Hounslow route because of the LUT’s activities. Indeed, if we consider the table above we can see that in the 10 years after 1900 the growth in the number of passengers, passenger train miles and passenger revenue slowed considerably in contrast with the 10 years before. Thus, there were worrying signs that underlying idea that had endured for decades, that the growth number of passengers would continue unabated, was probably doubted. Indeed, at the 1913 General Meeting, the investors were told that the company had lost £100,000 in revenue and the passenger numbers were by then falling by a million per year. Thus the company’s had, by that point, become a reality.

The first stage of the electrification plan was confirmed by the board in December 1912. The proposed routes to be electrified are shown in the picture. The move was therefore different from the rebuilding of Waterloo. Waterloo was rebuilt based on the assumption that Passenger traffic would continue to rise and that there would be no alteration in this fact. However, the Electrification scheme was adopted because of exactly the opposite reason, a fear that passenger traffic, and profits, would decline. Therefore, the attack on passenger traffic by the company’s first real competitors in the suburban passenger market must have been unexpected given the prior history of the L&SWR. Thus, they were made the decision because they were trying to protect their business.

The company completed the planned suburban electrification in the years after 1912, connecting to Wimbledon, Kingston, Hampton Court, Hounslow, Claygate and Shepperton by 1915-16. It was the Southern Railway that would continue the L&SWR’s work.

Conclusion

In the context of the profitability and performance problems of the British Railway industry in the late Victorian period, what could be said about these two events? Firstly, it is evident that despite the failing profitability of the period 1870 to 1900, it wasn’t substantial enough to change the company’s reaction to the increased passenger traffic and the need for greater facilities. Faced with capacity problems they did not try alternative ideas to solve them, for example reducing the number of trains running into Waterloo or closing stations to reduce the number of passengers carried. Instead, they continued with the long-standing pattern of rebuilding existing facilities so every passenger would be accommodated, confident in the knowledge that the cost would, eventually be covered. However, they were shocked into action when the passenger growth, that had always been expected, did not materialise because of new and unexpected competed forms of passenger transport. As such, they were forced into reacting to their business environment by trying to protect the traffic they did have.

Thus, what these two large L&SWR investments symbolise is an important moment in the history of Britain’s railways. The early 1900s were when companies stopped considering that Traffic would always continue to rise, but rather, tried to protect what they had because the business environment had changed. In essence, the period was when Britain’s railway’s would start their long decline towards Beeching.

Bibliography

Faulkner, J.N. and Williams, R.A. The LSWR in the Twentieth Century, (London, 1988)

Related Posts Plugin for WordPress, Blogger...